FIRE SUPPRESSION SYSTEM INSTALLATION PROJECT
1. APPRAISAL / COLLECTION OF INFORMATION
- SITE VISIT to calculate VOLUME m3 of the space to be protected
- Dimensions of the space L x B x H
- Ventilation type In Space - Is it natural ventilation which cannot be CLOSED ? Is it forced ventilation such as Air conditioning system or Blower pump ...
- How will the ventilation system be shut off/Switched OFF when the Fire Suppression agent is released into the protected Space ?
- What type of equipment is present or stored in the space. - Which Fire Suppression agent will be best suitable for that type of equipment ?
- Will the space have access for personnel ? people work in that space ? - this will decide what type of suppression system to be selected.
- Alarm & Notification - Are local audio+visual Alarms required + a central Alarm system ?
- SITE PLAN from customer, if available.
2. PLANNING & QUOTATION
- Identify which type product is suitable for the location
- Which brand is suitable
- Identify location of installation / Installation drawing preparation
- Identify quantity of equipment to be used in the project
- Product availability- Local products & Required Import products.
- STANDARD PRODUCT - will work ?
- Customization of Product required ? Contact Manufacturer
- Specific training or product familiarization required ?
3. EXECUTION / INSTALLATION
- Product pre-delivery/installation testing and verification
- Customer team meeting for product delivery & installation plan
- Pre-job Risk assessment on-site / PERMIT TO WORK system if applicable
- Verify All tools required available
- Commence installation of product
- Confirm ALL ITEMS installed as per plan.
4. COMMISIONING / MONITORING / TRAINING / HANDOVER
- Testing & Verification of product / System working as per plan.
- Product manuals handed to customer, any modification required from the original manual ?
- Final Installation Drawing to be handed to Customer
- Training to Customer on use, Alarms & Notifications, Alarm Resets etc.
- Issuance of Certificate or Service report for the project.
- Delivery note signing by customer
- Customer feedback Form signing by customer